Sr. No. | Responsibilities |
1.0 | Operation and maintenance related activity ; |
1.1 | Operation, monitoring and maintenance of Chiller, Boiler, Air-Compressor, Nitrogen Plant, HVAC System, Water System (RO-I and RO-II), soft water plant, Cooling Tower, Hot Water System, Filter cleaning and drying machine. |
1.2 | Operation, monitoring and maintenance of EMS and BMS Software and maintain the log sheet/records. |
1.3 | Report generation of EMS and BMS Software. |
1.4 | Execution of molybdenum test, passivation activity, colour coding of pipe lines, zero verification of Magnehelic gauge and maintain the log sheet/ records and take necessary action in case of any abnormality/failure. |
1.5 | Verification of all logbook/records day to day basis and take necessary action in case of any abnormality/failure. |
2.0 | Plant maintenance related activity ; |
2.1 | Maintenance of all mechanical items (i.e. pumps, motors, blowers, piping, valves etc.) and accessories of entire plant. |
2.2 | Maintenance and Troubleshooting of all Process Equipment and Utility Equipment (Mechanical Parts and Assembly). |
2.3 | Maintenance of civil doors, windows, lockers, cupboards etc. |
2.4 | Execution of breakdown as well as preventive maintenance and maintain the log sheet/ records. |
2.5 | Execution for gasket inspection of critical equipments and maintain the records. |
2.6 | Replacement of 0.2 micron filters at user points and maintain the records. |
2.7 | Maintenance and troubleshooting of all mechanical items, accessories of entire plant. |
3.0 | Building maintenance activity ; |
3.1 | Execution of building maintenance and maintain the records. |
3.2 | To take corrective action for building related abnormal observation (Inside /Outside vendor). |
3.3 | Preparation of indent and consulting with different vendor for complete the corrective action. |
4.0 | Project related activity ; |
4.1 | To coordinate with HOD, concern person of company and consultant for upcoming projects. |
4.2 | To collect necessary information/supporting documents to furnish the HOD for approval of project & budget. |
4.3 | Preparation of indent/CAPEX. |
4.4 | Preparation of technical comparisons for procurement of different equipments. |
4.5 | To check the BOQ – bill of quantity submitted by consultant and share the comments/suggestion with HOD. |
4.6 | Co-ordinate with purchase department and vendors for procurement of spares, equipments and machinery. |
4.7 | To coordinate with concern person/department to collect necessary data required for project work. |
4.8 | To workout the data received from all concern person/department and prepared sheet as per the requirement of HOD/Consultant to prepare the Site layout and Equipment layout/Floor Plan. |
4.9 | To perform the FAT/SAT as and when required. |
4.10 | To conduct meeting with contractors and their team for giving necessary instruction, guidance and quality requirement. |
4.11 | To execute, erection, installation and commissioning of equipment/ system. |
4.12 | To perform the qualification/validation activity. |
4.13 | To check the BOM – bill of material submitted by consultant and share the comments/suggestion with HOD. |
4.14 | To monitor the all individual discipline at each stage for timely completion of project. |
5.0 | Documentation and training related work ; |
5.1 | To initiate change control. |
5.2 | Preparation of risk assessment, URS, system criticality assessment, component criticality assessment, URS traceability matrix etc. |
5.3 | Preparation of SOP’s. |
5.4 | To initiate breakdown, deviation and initiation of CAPA. |
5.5 | To prepare impact assessment for CCF, breakdown and deviation. |
5.6 | To assigning the training or provide class room training. |
5.7 | Other training related works like, material uploadation, questionnaire preparation/uploadation, preparation of job responsibility etc. |
6.0 | Execution of routine qualification/validation related work. |
7.0 | Execution of plant shutdown procedure. |
|
|
8.0 | Any other responsibility assigned by HOD from time to time. |